| New
Non-Pressurized "Open" Outdoor Wood Boiler |
| Step 1 |
Clean and passivate system with required
amount of Prep Solution 102™ per directions
for new boiler. |
| Step 2 |
Drain and flush thoroughly. |
| Step 3 |
Refill and add required amount of Treatment Solution
101™. System is ready for use. |
| Step 4 |
Test chemical level each month and add accordingly
to always maintain a proper chemical level. |
| Step 5 |
Prior to the end of the heating season and draining
add Lay -Up Solution 103™ per directions. |
| Step 6 |
Drain and flush thoroughly. |
| Step 7 |
Refill and add required amount of Treatment Solution
101™. Add required amount of Biological Solution
(A-525 Biocide) per directions. |
| Step 8 |
Repeat Steps 4 - 7. ** If necessary use Scale-Out
Solution 115™ per directions at Step 5 in place
of Lay-Up Solution 103™. (FLUSH THOROUGHLY)
Following Scale-Out repeat steps beginning with Step
1. |
| Existing Non-Pressurized
"Open" Outdoor Wood Boiler |
| Step 1 |
Address and remove existing scale deposits if any
exist following directions and dosages for Scale-Out
Solution 115™. (FLUSH THOROUGHLY) |
| Step 2 |
Clean and passivate system with required amount
of Prep Solution 102™ per directions for an
existing boiler. |
| Step 3 |
Follow Steps 2-8 for a new outdoor wood boiler.
|