The
Successful Plan - Pressurized "Closed" Outdoor
Wood Boiler
| Step 1 |
Flush system with clean water. Add Prep
Solution 102™ per directions. |
| Step 2 |
Drain and flush thoroughly. |
| Step 3 |
Refill and add required amount of Treatment Solution
101™ per directions. System is ready to use. |
| Step 4 |
Test chemical level biannually, adding as necessary
to always maintain a proper chemical level. |
| Step 5 |
Add Biological Solution per instructions every third
season or as necessary to control biological growth. |